Well that didn't take long.
The village's Zoning Administrator promptly called at 8:30 this morning right after he got to work to let us know the plans we submitted were incomplete. Apparently since we we want to change the outside shell of the building by constructing a dormer, we need to submit before and after drawings of both the North and West elevations! ARgle bargle.
It won't be too difficult, but it will be tedious. Especially to get all the measurements. Woo hoo! Should be a fun weekend!
Actually, we've recruited friends to help demo the basement ceiling (lath and plaster) since we're going to need to sister all the joists in there to give the floors more support and a better solid feeling. So Scott, Sara, and Mike are coming over tomorrow to wreck things.
In the meantime, we had two (2) inspectors over today. One was the insurance inspector, who basically just needed to take a picture of the electrical panel and the furnace. Odd, but it was over quick.
Then came Rick, the village construction inspector for a pre-construction inspection. He gave some good pointers for remodeling the basement and reinforcing the main structural beam in the basement, as well as tips for the dormer addition. Perhaps best of all was his encouragement to add the kitchen remodel into the scope of work now rather than later. I'll ask the village about that when I resubmit the blueprints (with elevations) next week.