Tuesday, December 19, 2006

Wall covering has come

Drywall started magically appearing on the walls of our attic. At least, that how it seems when you leave for work and come home with new walls! What a difference hiring the pros makes - talk about the ultimate Easy Button!

Our garage was full of drywall - 70 sheets! - at the beginning of the week and we're down to about 10 now (sidenote: always buy extras for any project. Going back to return unused merchandise is so much more rewarding than running out to get more of something in order to finish the job!). We're installing several different types of drywall:


  • Standard 1/2" 4-foot by 8-foot sheets on the walls

  • Standard 5/8" 4-foot by 8-foot sheets on the ceilings

  • Standard 3/8" 4-foot by 8-foot sheets on top of older damaged 3/8" drywall in our stairwell

  • 1/2" 3-foot by 5-foot cementboard (Durock) in the shower and tile area surrounding the bathtub

  • Moisture-resistant "greenboard" 1/2" 4-foot by 8-foot sheets in the bathroom


The most interesting is the cement-board and greenboard in the bathroom. When Sara came by and saw the greenboard the other day she said "wow, you've already started painting in here!" Sorry Sara, but not quite. "Greenboard" contains an oil-based additive in the green colored paper covering that provides moisture resistance. Since we're adding a steam shower in our bathroom, we're making sure every surface has this installed.

The cement board, while difficult (and heavy!) to work with, is much better for wet water areas like our custom sized shower. Greenboard is not suitable for backerboard in this instance, and as of 01/2006 is no longer accepted in building code (International Residential Code R702.3.8). So grudgingly, I admit that building codes have their uses. I don't want to lean against the wall while taking a shower and have my hand fall through it like others have done.

So now that most of the wallboard is installed (only cementboard to go), our crew is working on the next step - plastering all the joints and screwholes. And then comes the messy part - sanding. I'm already trying to seal off the rest of the house so we have at least some kind of dust-free zone.

Monday, July 25, 2005

S(heat)rock Weekend

Scottie Sprung a Leak!
Lot's done last week. Not only did we move in, we got tons done on the basement. Of course, it helps when you have someone (else) working everyday on the place, as Scotty was able to do. Even Frankie came by for a couple days during the week to help out!

AND, SBC finally made it to hook up our phone and actually knocked on our door this time! Wonder of wonders! As Jen said, sometimes being a you-know-what can get things accomplished! So now we have phone and DSL! Long live the blog!

And although there were some occasional occupational hazards (see image on right when Scottie sprung a leak) along the way, we managed to avoid any major catasrophes.

Perhaps the most newsworthy item in Chicago this weekend was the convergence of music. Grant Park hosted Lollapolooza downtown, and the Vans Warped tour was intown as well, all while the city reached near-record highs of 103 degrees on Sunday! We managed to beat out most of the US in temps. I think only Death Valley was hotter (129 degrees).

Are those water pipes? No! Heating/cooling pipes!Of course, working in a basement provided a perfect excuse to beat the heat! It was relatively cool considering we had fans blowing air and drywall dust out the windows and door. It was so humid out that our heating ducts looked like water pipes!

Once the dust from Scotty's sanding started flying up though, it congealed into a nice sticky paste. That's okay.. Extra insulation for the future, jay says! :-)

Well, after many long hours, much more than expected, we have a ready-to-paint basement including new stairs (which Jay had been avoiding for some time, but thankfully Frankie came up with some clever solutions).
A Stairway nich... awaiting built-in shelves
You can see how we have a small niche under the stairs. This could be a perfect spot for an eventual built in shelving / storage, or a little desk. Jay quickly ran an electrical outlet there in case we need it later. On the backside of this niche is a closet for the "bright room" (so-named due the light that floods it from 10 am - 2 pm in the new glass block window Kenny helped install). We also had a few glass blocks left over, so we put them in the wall of the stairway landing to bring light back and forth between the "bright room" and the stairs. Plus, can you ever have too many interior windows? (joke).

We'll add a photo album later once Jen has a chance to put it together... Jay is photoshop-ignorant. :-)

Wednesday, July 13, 2005

FIVE DAYS AND COUNTING

We move into this joint in FIVE days. Monday we've hired Del's Movers to come out and move out all our stuff. Currently, Jason and his crew (which invariably includes Scotty, but also thus far Scott and Mark, as well) are busy busting their assess hanging drywall while I pack up the condo.

I need more boxes. And more hours. And more sleep. And more speed. I want to be BLURRY with speed.

Yet here I sit.

Check out the gallery. WTF?! I gotta go pack!

Also, BTW, my band, bad nurse, played its first show this weekend: www.badnurseband.com. We are soo cool.

Tuesday, July 12, 2005

Rough Inspection #2

Insulation inspection this morning. Although the inspector was an hour late, he was very apologetic and was at Humphrey House all of 5 minutes. "Looks good. You just need to put some insulation up in the joist bays along the outside walls." So, PASS!

Now Menards is dropping off 60 sheets of drywall later today. Hopefully we'll have walls by Monday!