Friday, May 20, 2005

A Call To Arms

Looks like we're going to have to move into the basement. Wonder of wonders, we're having issues with the village (again) who have admitted there's really no way that we can get a zoning variance for our proposed dormer (which, although it wouldn't extend past the exterior of the current house, would be six inches too close to our lot line - apparently, our currrent wall is grandfathered in, but if we make a single modification to that wall, we is in BIG trouble, hoss). Which has sent us in a mad scramble back to the drawing board, literally. We have to shave 8 inches off our dormer proposal to be in compliance and start work. But since we have to redesign, we must re-submit plans to the village for approval.

Hear that big cracking sound? Yeah, that was my head splitting wide open. SIGH.

ARGLEBARGLE!

Tuesday, January 11, 2005

Village Hall, Take 2: Zoning Restrictions

Apparently, the original builders of our house decided to put us 2'6" from the lot to our North.

Apparently, the closest a structure can be is 3 feet. And any changes to a structure must be more than three feet away.

So in submitting the revised plans this morning, Jay learned that in order to build a dormer upstairs, we have two choices:


  1. Move the dormer addition back 7" and figure out how to structurally engineer this since the weight will no longer be on the existing exterior wall.
  2. Request a zoning variance before the infamous Zoning Board of Appeals (ZBA)

Fortunately, Jen has much experience with the ZBA as a result of a 9 month ordeal at her previous employer.

Unfortunately, it can take 2-3 months to schedule a hearing, and then longer to approve the plans.

Fortunately, Jay was able to persuade the village to allow our permits to be done in phases - all other work first, then the bathroom and dormer addition second (pending ZBA approval).

Unfortunately, we still have to wait for the village to look over the Phase 1 plans before beginning any work.

Fortunately, they are all pretty familiar with this project as at least 7 people have viewed these plans now in Jay's presence.

Unfortunately, we also have to figure out some kind of drain tub system for the laundry room upstairs. This is to protect the house in the case that the washing machine ever leaks / breaks / overflows.

Fortunately, adding the kitchen remodel and hot water heater replacement to the scope of work cost only $50.00.

Friday, January 07, 2005

Stop! it's the Zoning Police

Well that didn't take long.

The village's Zoning Administrator promptly called at 8:30 this morning right after he got to work to let us know the plans we submitted were incomplete. Apparently since we we want to change the outside shell of the building by constructing a dormer, we need to submit before and after drawings of both the North and West elevations! ARgle bargle.

It won't be too difficult, but it will be tedious. Especially to get all the measurements. Woo hoo! Should be a fun weekend!

Actually, we've recruited friends to help demo the basement ceiling (lath and plaster) since we're going to need to sister all the joists in there to give the floors more support and a better solid feeling. So Scott, Sara, and Mike are coming over tomorrow to wreck things.

In the meantime, we had two (2) inspectors over today. One was the insurance inspector, who basically just needed to take a picture of the electrical panel and the furnace. Odd, but it was over quick.

Then came Rick, the village construction inspector for a pre-construction inspection. He gave some good pointers for remodeling the basement and reinforcing the main structural beam in the basement, as well as tips for the dormer addition. Perhaps best of all was his encouragement to add the kitchen remodel into the scope of work now rather than later. I'll ask the village about that when I resubmit the blueprints (with elevations) next week.

Tuesday, January 04, 2005

Village Hall, Take 1

Well, I spent my lunch hour today down at the village hall submitting the plans my mom drew up and filing for the General building, HVAC, Plumbing, and Electrical permits. We got it all baby. The way they calculate these things is by the amount of square footage affected by the proposed alterations.

Although the dormer itself is only a couple hundred square feet, we need to do a lot of structural reinforcement and correction first. Especially in the Master Bedroom.

Believe it or not, the current joists in there are only 2x6 joists - and they're spanning above the living room which is 17 feet long!! The max span for floor joists is generally considered 1.5 feet times the width. So 6 times 1.5 = 9 feet. The current joists are almost spanning twice that length! No wonder it feels like you are walking in a salad bowl when going across that floor!

We also want to fix some structural supports in the basement underneath the living room and under the kithen. SO they pretty much figured on calculating the entire living area of the home, except the middle of the first floor (dining room/office). In addition to the 47 electrical openins being added / changed upstairs, and the plumbing fixtures... the total bill came to $1200! And that is including other items like replacing the garage door, running HVAC, etc. I couldn't believe it was that much. We may just have to change our scope of work to include the kitchen remodel too (we were originally going to include it in a few months) since we've already paid for the square footage!

I must say that despite the outrageous costs and rules, the people working at the village are pretty helpful. I think they tend to treat me better as a homeowner than they do the contractors who come in there and do things on behalf of other owners, but the structural engineer and administrative people have been very helpful in making sure everything that needs to be on the plans are on there.

Now, the plans are kicked over to the zoning people to get approved before they can go through the plan review part and receive official approval. Unfortunately, we can't technically do any work until it is approved - that includes demolition. The only thing we are allowed to do is remove carpeting. Yeah right. ;-)