Thursday, October 05, 2006

Serenity now, dammit

As all our visitors of late have noticed, the sanctuary of the backyard is totally gone these days, having been stripped of all green by virute of serving as storeyard for the upstairs de/construction. Apparently all that grass dutifully tended by Sara and Jason for the past year only had one good party in it. So we're growing more. We're trying to anyway, if Sam the Bunny will give us a break.

But sweet serenity has returned to the Humphrey House. At least a little. After grustling about it for a year, I finally got a move on this past weekend and cleaned off the front porch. Lovely, isn't it?


Tuesday, September 19, 2006

Fun finds never end in our home

Just because we haven't posted in awhile doesn't mean progress has not been made. In addition to dealing with a computer hard drive failure, we've been tackling minor things that need to be finished up before we drywall the attic.. I've started to refer to it this work as "trim framing." Trim framing may consist of any of the following:

  • Scavenging the scrap pile to find the magical piece of lumber that is the proper thickness
  • Scavenging in the garage for the same
  • When that fails, ripping down 2x4's on the table saw to proper thickness
  • Using old (read: non-nominal) lumber, which is thicker than today's wood
  • Shimming behind 2x4's
The idea is to have straight surfaces so the wallboard attaches to a (mostly) flat surface. Tedious work, but as they say, the devil is in the details.

We thought there were few things left for us discover in the house. Little did we know! When doing some work to add an electrical outlet in the first floor bedroom, we found a "hidden" single outlet disguised in the baseboard.

Further investigation revealed that it was a lightbulb socket!?!

Apparently, instead of putting in a normal outlet, some previous owner thought this would be a better route. Fearing an electrical fire if this were actually used, I promptly removed the 'whip' that attached this to the power supply in the basement to disconnect it and began to remove the offending creature.

But now I wonder.. Since the baseboard is already cut up and destroyed, maybe we should just leave the light-socket-outlet-thingy in the wall (but disconnected) as a piece of personality for the house. It would also give some future owner a chance to puzzle over it as well.

Friday, September 01, 2006

Welcome To Humphrey House University ...

Looks like this weekend is gonna be a worker after all. Our previously scheduled plans to celebrate Jay's dad's b-day have been scrapped due to dog fungus - yes, you read that right - so we've got a three-day weekend to fill. Since I've been on house hiatus for a while now, I think this weekend will serve as a good educational tool for me. Classes planned include:

  • Experiments in Drywall 201 - I passed Drywall 101 during the basement phase, so I should be ready to learn a bend. Of course, I realize I passed only because I was the sole girl, and because at least I didn't do what Scott did on his first sheet and put the drywall on backwards. Regardless, we've created these little glass block niches (we just like our glass block, dammit) that we need to wall in. However, we don't have the lovely screwguns like before so it may not be as much fun ...
  • Studies in Shower Scenes & Toxic Fumes - For too long, we've lived with a bizarre situation: A wood-framed window painted shut in the shower. While I no longer feel (too) self-conscious showering in front of a five foot window that's five feet from my neighbor's living room windows, the lack of ventilation in this, our only bathroom, has been suffered through too long. Having to wait an extra ten minutes after waiting for the bathroom all morning just isn't working. The window must be replaced! We've got a glass block window, complete with vent, ready to go - just haven't had the time or focus or whatever. Bring on the tile destruction! Let's go!
  • Fun With Screening - I had to re-screen a window when I was in college and my sublettee's son played with razorblades and hacked out pieces of my screening to spell out his name (at least the first two letters before he got bored). So this is more of a refresher course. I want to rescreen the windows on the front porch so we can open them all, not just one. It'll be fall soon, and I'm so looking forward to that breeze blowing through the porch into the living room with yellow leaves falling outside. Which brings me to ...
  • Organizing Your Life For The Clutter-Prone - I've taken this class many many times, thank goodness repeats are allowed. The front porch needs some serious attention. After all, Halloween is coming, and how can I be expected to maintain our "Halloween House" status if the front porch is covered in boxes of Care Bears, weight benches, old purses and my art supplies?
Hope I graduate soon ...

Tuesday, August 22, 2006

Wiring Dilemma

Before the sublfooring in our attic conversion was installed, I used some of my newly acquired plumbing skills (and leftover pipe) to run a chase from what will be our "utility room" upstairs (one side of the low space behind the attic kneewall) all the way under our bedroom to the other side of the attic, behind the the other kneewall. The plan was to use this chase for wiring, such as cable TV, phone, etc.

Well this weekend during the Menards-17%-off-anything-in-a-bag-sale, I couldn't resist the temptation of topping off our bag with some Cat-5 (computer network) cable as well as cable TV (RG6 coax) cable. I already have tons of telephone cable (Cat-3) left behind at my employer's previous location, so I was all set to go.

I started running these three cable types in our attic last night - RG6 Coax, Cat-5, and Cat-3, but I paused halfway through the job with a question (plus it was 1:00 am); Will having these three different cables all bundled next to each other result in any signal bleeding or interference? What if I run audio speaker wires alongside too? Hmm.. time for some research.

Tuesday, August 01, 2006

A baffling roof ventilation problem

Warning: Technical and possibly boring post. But nonetheless I wanted to document this.

Remodeling HumphreyHouse has presented us with an opportunity to change the air movement in our attic. In order for a good roof to maximize its expected lifetime, and to increase a home's comfort level, it's important to have good ventilation in the attic.

In summer, the underside of a roof collects a ton of radiant heat, as Jay found out first hand this weekend when Chicago was gripped with a heat wave. Without ventilation coming in to move that air up from the underside of the roof to a vent near the peak, the heat has nowhere to go but through the insulation and into the house. Making an attic unbearably hot. During the winter, the heated air from inside the home carries water vapor from laundry, bathrooms, cooking etc. and when the warmer air hits the cold rafters and roof decking, it condenses and can create moisture problems.

Warm air can also cause the snow on top to melt and run down the roof. Now, you may not think this is a bad thing, except when that water runs over a soffit, which is not heated, it will form an ice damn near the end of the roof eave, causing water to refreeze on the shingles and work its way underneath to enter the house. We had some loooong icicles last winter, so hopefully we can avoid them turning into ice damns in the future by increasing ventilation.

However, the problem we're running into is one of headroom. Our rafters are only 2x4s, and we want to get as much insulation as possible without shrinking the room too much. We settled on R19 (2x6) insulation for the sloped part of the ceilings, which requires simply furring down the existing 2x4s. The flat part of the ceiling will have R38 (12 inch) insulation. But this doesn't leave much room for vent chambers - especially the typical foam baffles that you can purchase. These are 2 inches thick, and while we put them under the dormer roof, and will still have plenty of insulation, we won't have much room if we do that in the rest of the attic.

So with our HVAC installer's help, we devised an alternative solution that maximizes our insulation while still creating air chambers for ventilation. We installed a PVC pipe that connects the behind-the-kneewall part of the attic to the peak of the roof, and put a pipe into each rafter bay. In the laundry room, which will generate a lot of moisture, Jay drilled the PVC every few feet to ensure any moisture will get carried away in winter.

But how will the air travel up those pipes to begin with? We plan to install standard 2x4 insulation in the kneewall areas just in case we want warm/semi-heated storage, and to keep extreme weather from coming inside. So before stapling up that insulation, we furred down the 2x4 rafters behind the kneewall with 1x2's. That would leave a 1" gap for ventilation across the lower part of the roof once the insulation was installed (ice dams, bedamned!) These chambers terminate at a mini-peak at the top of the kneewall to take advantage of existing mushroom vents in the roof, and the PVC is right there to carry the air up to the attic peak where we have more mushroom vents.

So, to make a long story short, our plan is to have sufficient air movement under our roof and above our insulation, which will hopefully keep everything more comfortable and enjoyable.

Sunday, July 30, 2006

Piping for 13 hours

Saturday was quite possibly one of the longest days working on our house. Or maybe working in an attic during the 105 heat index made it feel even worse. The day started off well (and cool) enough, as our electrician Fred showed up as promised bright and early. After walking through the details with Jay, he put together a shopping list of a few extra items that Jay had not already picked up.

While Jay ran to Lowes, Fred started drilling through walls studs, sawing 1/2" metal conduit with a cool cordless bandsaw (which Jay promptly nicknamed "The Green Machine"), and contorting metal conduit into all kinds of funky shapes. Smartly, Fred started working on the non-A/C side of the attic first (the side that faces West and will be the master bedroom). He had most of the bedroom complete by the time Jay returned.

In the past year since Fred wired our basement, Jay had tried a few times (mostly unsuccessfully) to work with conduit and the pipe bender he has. Now, Jay was a willing apprentice as Fred tried to teach him some of the tricks of measuring and bending conduit. With a little help, it actually wasn't too bad. Jay ended up doing the stairs, half of the hallway lighting and smoke detectors, and half of the spare bedroom before the day was done.

Granted, that is only about 15% of the work and Fred needed help on some things a lot, but still, not too bad for an amateur.

By 5 o'clock we started moving slow as the heat sunk in and the A/C struggled to keep up. But Fred was determined at that point to get all the piping done before he left for the day. We pressed on, figured out a way to route the conduit down to the main circuit panel in what's termed the "homerun". I thought Fred kept referring to the Cubs spanking the Cards until I figured that out. Additionally, the centrally-wired smoke detectors will need to be wired into existing smoke detectors in the basement, so that required another pipe coming downstairs as well.

Then we determined that we were out of conduit. We'd already gone through about 450 feet of pipe(!) but needed another 40 more to finish the spare bedroom. Mostly this was because an earlier pipe Jay had run before the floor was completed turned out to be unusable.

After thinking this spelled the end of the day, Fred said no way. He was not leaving when we were so close to finishing. Maybe he's just a glutton for punishment. Or was trying to avoid his visiting in-laws. At any rate, when the work was finally done it was pretty much 8:30. Subtracting the half hour for lunch, that was 13 hours of work! Wow.

Fred says pulling the wires should only take 1/2 day though. Not quite clear if that means a normal 7.5 hour day or a true half day (4-5 hours) though. At any rate, he'll be coming out to finish the job and hook up some temporary outlets and lighting for us. Then we'll actually have power (or Lectre) and be able to call for the rough inspection. Woot!

Thursday, July 27, 2006

The 'Lectre is coming!

When my cousin Chase was around 5 years old, he had a tendancy to give special powers to his toys. The action figures invariably had the ability to "Lectre" any villians. I thought this was some wierd invention he came up with, or maybe something was lost in translation due to the foreign culture (he's from the South). After all, he later told me how he wanted to be a firetruck when he grew up. But after several weeks, it finally dawned on me that this was his shorthand for "Electricity."

We at HumphreyHouse are looking forward to this weekend, when our electrician Fred will be coming over to Lectre the upstairs. While it is doubtful he will complete everything, hopefully we will at least get some decent lights up there, and be able to walk up and down the stairs without tripping over extension cords anymore.

Maybe Fred can even teach Jay how to measure and bend conduit on his own for the future, too! We can only hope that our anticipated 99 degree highs (with 80% humidity) can be tempered with the extra window A/C unit and temporary HVAC we've routed from downstairs. Or hopefully at least enough to avoid dehydration.

Monday, July 24, 2006

How it feels to live in HumphreyHouse

Over the past weekend, we saw many friends and family members, who invariabily asked "How's the house coming?"

Well, sometimes it just gets overwhelming, so much so that it can almost be difficult to express in words. That is, until you find a cartoon that sums it up perfectly:



Also interesting was that the Chicago Tribune devoted an article to "houseblogging" on Friday - yes, there is a term for what we do here at HumphreyHouse. And others who do it too! In fact, for those inclined, you can read (or commisserate) with others over at houseblogs.net

Tuesday, July 18, 2006

A skeleton in the attic

Gramma's ghost has given way to a skeleton, as sidewalls, knee walls, and ceilings emerge upstairs.
I think this is one of my favorite parts of the whole construction process. For the first time, you start to see how the plans and designs you drew up (years ago) physically take shape. No more 1/4" = 1 foot scale; this is the real thing. Three dimensions, baby!

And it allows you to come up with other ideas. Such as pocket doors to allow more space (and light) into what will be a somewhat narrow laundry room. Or laying out and framing openings for future built-ins, such as two dresser drawers in what will be the master bedroom.

Many of the interior walls are being constructed by our contractor, but Kenny and Brian came up to lose weight during Chicago's massive heat wave last weekend by working in our attic with Jay. Actually, Brian raised the ceiling framing in the master bedroom, and Kenny helped construct the knee walls and insulate the under-eave areas.

Getting the materials upstairs proved to be fun as Mark briefly stopped by at the perfect time to help Ken and Brian toss boards up through the window. This assembly line was so much easier than carrying things through the kitchen and up the stairs. Wish Mark had thought of this sooner! ;-)

Anyway, thanks to Brian and Kenny's help, we got through the long weekend, and we are nearly complete with the framing for upstairs. We're planning on having the electrician come next weekend, and it all needs to be in place by then.

Wednesday, July 12, 2006

Living Room Renaissance

Last weekend, Jen's dad came up to lend a hand with a variety of tasks. While our contractors worked on completing the subflooring upstairs, Kenny and Jay worked on tracing the path of the living room light fixture.

Backstory: After moving in, we noticed an unused electrical box with a cover on it in the center of the ceiling. Not too surprising, right? Well, the surprise was that there was no switch to be found on any of the walls. Even shining a flashlight up along the wall to look for signs of obvious patching yielded no clues (although it did show us that the arches were added after the walls were built - probably in the 50's when that was a big remodeling movement).

While we had guessed where the switch might be, we never really knew until the floor upstairs was removed. Jay was then able to trace the conduit down to one joist bay, in the wall between the living room and the foyer. We also found that this light was one of the three gas-electric lights in the house, along with the Kit and DR. How cool! (The gas lines had been removed in the basement long ago). Now we knew where the cable led to, so we just needed to find the old switch box that some Previous Owner (PO) decided to cover up.

However, it turned out that our detective work was not quite finished. To locate the box, we drilled test holes at the right height for a switch box. Didn't find anything. One of us went upstairs, shook the electrical conduit like mad while the other tried to "hear" if the box had just been pushed into the wall and was floating around in there. Nothing.

We began to question ourselves. If some PO had removed the light, there must have been a good reason, right? I mean, you don't just go about removing lights from your house, do you? Was the light leaking gas (when it was gas-powered light) or something? Was the electric line broken somewhere? Were the wires even properly taped or capped off?

Finally, we decided to start cutting a hole about 4 feet off the ground in the wall. But from the backside (our entry closet) - so at least the living room side would appear okay. Still nothing. Where could it be? We peeked upwards from the hole and were shocked to see the electrical box - about a foot up! This means that the original switch was nearly 5 feet off the ground! No wonder we found no trace of it. We can only assume the Original Owner must have wanted this for some reason. Maybe so kids wouldn't play with the gas-lights or something. Or maybe they just ran out of conduit.
Anyway, we eventually got a new box installed at a normal height, tested the circuitry (it was all in good shape), patched our holes, and attached a vintage-looking light fixture that Jen and I had found at a demolotion sale last year. And guess what? It fits the style of the room perfectly! Which leads me to wonder, why did some PO remove the wall switch?


(Click for larger image)

Thursday, July 06, 2006

Plumbing, Take 2

Well, I now feel like I could act as a plumbing consultant (at least for OP village code) to ensure that everything comes into compliance. Educational experts always say that the best way to learn is through failure. Well, that's what happened to us, along with a whole lot of extra work. Good thing we had the extra time from a holiday weekend.

We started off by demolishing (yet another) wall in our kitchen to expose the cast iron pipe. The old vertical stack needed to be replaced since we were cutting out a section of it below. That was a bear of a job, but a special chain pipe cutter that John brought made the job easier. Unfortunately, in order to remove the old stack, we also had to replace the 1st floor bath toilet drain which was molded into the old cast iron pipe. Of course, in order to fully reach that, we had to drop one of our HVAC supply ducts in the basement. Then we were finally able to start chiseling out the old drain, which was embedded in the 3-4 inches of concrete "subflooring" under our first floor bathroom. It's hard to convey just how hard this whole process was in words, and, sadly I did not take any photos before the cast iron was removed. But the whole process took the better part of Saturday, if that gives you any idea. By the time the pipe was out, we had just enough time to run the new PVC pipe from the basement upstairs, and reconnect our toilet.

As you can see, things started to get messy and complicated in the basement utility room with all the PVC pipes from upstairs connecting in to the stack.

After failing our inspection last week, we learned we could purchase a copy of local building code amendments for "a nominal fee". Turns out that it is only $5.00! Well worth the investment, and something I wish we'd known of earlier. It will definitely come in handy as it contains the amendments for ALL building codes, not just plumbing.

So on Monday, we moved on upstairs and rerouted all of our "improper" venting in the attic. We did this early in the morning (8am!), which fortunately turned out to be relatively cool up in the attic while it was raining. By the time the showers passes, it was noon, and we had completed everything except pushing the pipe through the roof (finished later that afternoon).

Then it was down to the basement, where we were able to devise a monstrous maze of piping. (photo coming soon) Why so complicated? In order to make sure every little nit-picky thing that we could be failed for was taken care of so there was no chance of failing the inspection again.

And guess what, when the inspector came at 10:30 this morning, he was very pleased to see everything was so well done and completed correctly. So, now we can continue with flooring and framing!

Wednesday, June 28, 2006

Feeling like failure

Sadly, we failed our plumbing inspection yesterday. Apparently the term "partial" inspection we used when setting the appointment wasn't good enough, and so he was expecting a full-on system ready to go.

I've tossed it over and over in my mind. Maybe its because the inspector was new on the job and out to prove himself. Maybe when he learned this was done by the owner, that he was out to teach a lesson. Maybe the six problems were all minor and innocent enough by themselves, but when combined, simply amounted to too much error.

Whatever the reason, we're now looking at a not-so-independant weekend to fix the problems. We can't get the flooring people to continue until the following are fixed:

- Apparently the condensate water that comes from a furnace (you know, drip. drip. drip), is far to excessive (sarcasm) to put down a 4-inch vent pipe from the toilet below. This is known as "wet venting" and is prohibited. What if that drain blocked the sewer gases from escaping below? Arg.

- Unfortunately, this means running a new drainline, roughly where the wall between the first floor bath and kitchen is. Since there's a lot of cast iron there, we have to remove the entire existing plumbing stack. Which we have to do anyway because the inspector said if we change to PVC anywhere on the stack, everything else must be PVC.

- On a different note, the point where the vent exits the roof is too close to the skylight. We had it 7 feet away (which is fine with illinois plumbing code), but OP needs it 12. So we have an unusable hole in our roof, and must re-route the vent.

These are the biggest issues. The others are smaller and aren't worth mentioning. Or maybe I'm too frustrated to do so. At any rate, Jen has gone to the evil village, and purchased a copy of the code amendments (a very new service they offer), so we can study up and be prepared for the re-inspection next week. We only get one of these, and then we have to start paying extra fees, so hopefully we can slip it by.

Oh, of course, the framing inspection went fine. There is only one minor correction needed.

Here Kitty Kitty

Tuesday, June 27, 2006

A complete shell



Our dormer is now completely framed - roof and all! We have a torched-down asphalt roof (because the slope is so low), and the sides are, well, sided. We were fortunate with the weather as we only had one slight rainfall. It was actually the morning the roofers were here, but it only interrupted them for an hour.



Over the weekend, Jay's stepdad came over to help install plumbing. Several hours (and plenty of glue sniffing) later, we had about 80% of the plumbing lines that we will need for our new bathroom upstairs.

Some of our initial dormer bathroom layout revolved around where we could run plumbing up and down to the second floor. This week, after a bit of analysis, we realized that there was a large unusable area we could use that was already in place... the back of the narrow closet in the first floor bath! It's 30" deep, but only 18" wide, which means most of the back is too dark and hard to get to anyway.

In addition to housing the drain pipes from above, this will likely be where we run up natural gas and AC lines for the upstairs furnace too. Fitting the pipe into the back turned out to be relatively simple, once we busted through 4" of concrete in the bathroom floors. Talk about a solid foundation for tile!! As John is fond of saying, they just don't build em like they used to!

Friday, June 16, 2006

Another Eventful Day.

Today was an.. Interesting day. Sometimes, it truly seems that the sagas never end when renovation is going on. Today, in fact, could quite possibly be described as a series of unfortunate events:

a) We found out the window we picked out earlier this week won't work. A window above a bathtub (less than 5' off the ground) must be made of tempered glass (like an auto windshield), so that if you slip and fall when stepping out of the tub, you don't shatter the glass and slice your legs off. Yes, it's part of the building code. Fortunately, our alley-neighbor Mike (who is graciously letting Jay park his truck in one of his spaces) sells Andersen windows. So we put in an order for tempered, obscured glass with a nice Prairie-style grill. Should be here in 3 weeks.

b) After ordering a 4'-wide window, we discovered the contractors had already framed the opening. At 3'-wide. Fortunately, we were able to change our window order.


c) Around 11am, Mike called Jay to tell him the dumpster truck was here to pick up the full dumpster. But Jay's truck (parked in Mike's lot as previously mentioned) was in the way. Jen had to leave work to go move it.

d) Shortly before noon, the contractor's office called Jay to inform him the dumpster had been successfully loaded on the truck. The problem was that now the truck could not leave due to a different car that was in the way. Jay asked which car, but they didn't know, so they gave him the phone number for JL Rolloff.

e) After a few unsuccessful attempts, Jay got a hold of JL Rolloff moments after noon. The dispatcher said, "oh yeah, our driver just left there. It took him awhile but finally he was able to get three other guys (Mike the neighbor + 2 of the carpenters), and they lifted(!) the car in question and pushed it out of the way.

f) Meanwhile, back INSIDE the house, actual work was being accomplished. Specifically, framing the three exterior walls of the dormer. Here's the eye-candy:



g) Apparently, while working on cutting some of the lumber in the backyard, the foreman Arthur, was injured by one of the other workers throwing out pieces of our roof. Jen tried to offer him ibuprofen or something for his apparently broken ankle, but he refused.

h) Arthur did tell Jay as he was leaving that he would return tomorrow morning to frame the roof of the dormer. "On a Saturday?!?" Jay asked. "Why not?" he replied, "But maybe we be a little later, maybe 8 instead of 7 turdy." "Yeah," Jay said. "Sleep in a little - it IS Saturday after all."

Wow. Lately, there has been a lot of discussion about how immigrants "ruin" the availability for jobs for American citizens. From what I've seen this week, legal status isn't what people competing for these jobs should be concerned about. The work ethic of these guys has been amazing. They work from 7:30am to 5:30pm or so every day and only take a 30-minute lunch (sometimes shorter). Hard work and dedication, to me, are the spirit that the American dream was built on. Inpsiring.

So maybe not everything that happened to day was unfortunate. But it certainly was eventful.

The price for level floors

Well, our crew is halfway done with our floors upstairs. Some of the problem areas (such as above the living room) are already framed with the new LVL joists, and there is some temporary plywood sitting on top of them. Without the floor even being finished, there is already a noticeable difference in our floors. You can actually walk across the "room" without feeling like you're walking in a bowl like it used to feel!

Quite refreshing, to be honest. Especially since this is where our bedroom will be. The key to this whole system was lifting the existing floor from below into a quasi-level state with some house jacks.


The old floor was so far out of whack that we lifted approximately 2 inches at the center of the celing beneath! The new joists are sistered to these old joists, and span the whole length of the room, so they will effectively be holding up the original joists when we release the jacks.

All this, and only 2 small crack in the ceiling's plaster. Other rooms in the house, however, were not as fortunate. A small hole has developed in our first floor bedroom from a dropped (tool? foot? lumber?). Other cracks or smaller holes are evident throughout the other rooms on our first floor. The biggest thing may be the lighting fixtures in our DR and Kit, which dropped down while Jen was making lunch the other day! Thankfully the ceiling fan was OFF, otherwise she may have been beheaded!

Our home is sadly an official hard-hat area now. :(

Thursday, June 15, 2006

How cool is that?

As if we didn't have enough going on this week, just to make things interesting, Chris from powerzoning came by on Tuesday to swap out our existing furnace and broken A/C condenser with a brand-new high efficiency model. To our dismay, on Memorial Day weekend when Chicago got into the 90's and humid (in May! The global warming debate rages on), we discovered that our old A/C system was no longer working.

Since the furnace itself was older and kind of inefficient, we figured now was the time to upgrade to a new HVAC system. We scheduled it this week because it is now much cooler in Chicagoland, meaning it was easier for them to fit us into their busy schedule of service calls and installations. Also, how fun is it to have six (6!) contractors working on your house in one day?

After a few hours of work, we had a super cooling cure for this summer's heat, and he reinstalled the Powerzoning system too! Our new furnace is made by Armstrong Air, is slightly smaller, but is nice and shiny and much quiter. Say Hi, Chris! :)

Chris will be coming back soon to install a secondary system for the upstairs attic. It's hard to think that far ahead at this point when things are so crazy, but we told him to keep his calendar open.

Who says you need a roof?

Well, they've done it. They cut open our attic roof to make way for the dormer, and it was truly a marvel to see how much a 20-foot skylight changes things. I don't know if I can fully describe in words, so I'll just post some pix (click images for larger view):

It started innocently enough by cutting the angled part of the attic roof.


Then it proceeded to a 20-foot long hole! They had to erect a temporary wall to hold up the opposite side of the roof.


Cross section of the area behind the chimney (looking East):


... And the other side of the chimney, which we discovered is in desperate need of repair. Jen is a fan of all the light upstairs, as long as it doesn't rain.


When the workers left for the day, our attic became a tinted shade of blue as they tarped off the hole. Looking up at the soothing blues almost make us forget we live amidst chaos. Almost.

Tuesday, June 13, 2006

Attic Exposure

We've moved completely downstairs now. Last weekend Mark, Sara, et al helped us prepare for Monday's start date with our contractors.

After a brief mishap to start the day when their dumpster people said "No way this will fit in your backyard," things got moving once they contacted our previous dumpster service, JL Rolloff (how can we not go with a company that has our initials?) Then our backyard filled up with building materials. And then debris.



After several hours of sawing, ripping, and prying our entire second floor was, in fact, floorless. All the old subflooring was stripped out exposing the ceilings (and electrical runs) from the first floor.

Also, the contractors recommended we install a window (since we ended up moving back the dormer to comply with zoning), so last night we went Window Shopping. After an eventful evening criss-crossing Chicago and Western Suburbs (Lowes, Home Depot, HOBO, and Menards) we finally found one we liked.

And to cap off the day, Jay figured how to get the old mortise lock working so we can lock the basement when we leave for work. Phew!

Monday, June 12, 2006

Gramma's Arrival on a Firy, Smoky Night



Once upon a weekend bleary, after working to exhaustion (nearly)
on the humphrey house and yard till our muscles were all sore
while we kicked back, just talking, laughing, suddenly there came a tapping
as of someone's cane just rapping, tapping on the fence-gate door.
"It's just some kids," Jason said," tapping on the fence-gate door
Only this, and nothing more."
.....
But now GRAMMA, never moving, still is sitting, still is sitting
In the window facing eastward, silent on the second floor
Sitting in her rocking chair as days go by she's always there
and the light behind her streaming throws her shadow on the fence-gate door.
And as we wonder, will we ever, complete this house, our big endeavor?
We hear the whispered, "never, never!"
Quoth GRAMMA, "Nevermore."

Thursday, June 08, 2006

Sanctuary



Ah ......

Who knew I was a fan of the serene outdoors? With all the chaos inside the house, I've been turning towards the natural side to feel a sense of accomplishment lately. It's feeling lovely. More pictures are posted below.
SERENITY NOW!

Tuesday, June 06, 2006

Tuesday, May 30, 2006

Garage Facelift

Well, the construction season has arrived at HumphreyHouse, that's for sure!

Last weekend, following the plan, we dove into a facelift for the garage to give it more of a "prairie wheat" hue rather than the "rusty brick-shit" color we've been staring at for the past year. Saturday started off bright and early with a paint job for the trim, and preparatory work like removing the spotlight over the door.

Around 10, Mark showed up and he and Jay started off installing siding. Mark had never done it, but is always eager to learn a new skill and thoughtfully point out flaws in Jay's thinking. That's not an insult, but a compliment; he keeps the big picture in mind. Anyway, Jay had once helped Frankie and Jen side part of their house, and figured, "eh, how bad can it be?".

Well, I'm pleased to say he was right. It was a little slow at first, but we quickly learned that installing vinyl siding, even over an existing wood siding, is a relatively easy task. They started on the side of the garage that is close to our neighbors house - the side we never see, and worked things out like getting the overlapping seams facing the same direction and more. They got started a bit late due to a delay from a bench-clearing brawl during the Cubs-Sox game and interruptions when Jay sliced his thumb and Mark sliced our tree, but by the end of the day, the North wall of the garage was done.

Sunday was the most impressive day though, as they moved to the side of the garage that faces the house. The slideshow below is captures the transformation in progress...










Tuesday, May 16, 2006

Going Tankless

On Friday morning, a piercing scream woke me better than any alarm ever could. I soon discovered that Jen was rudely informed by our plumbing system that our hot water heater had given out and was no longer working. Unfortunately, this was while taking a shower. Not the best way to start the morning.

ThermocoupleI fooled around with the pilot light for awhile trying to relight the burner. The pilot light would catch, but as soon as i released the priming button to turn the burner on, the flame would go out. After work, my stepdad told me that it was likely due to the thermocouple going bad. This little copper safety device ensures the pilot flame is present. When heated by the pilot flame, a small electrical signal is generated and sent to the main gas control valve. In the event of pilot flame failure, the electrical signal is no longer generated, and the main unit shuts off the gas flow to the burner equipment. So when our electrical signal was gone, so was our water heat. Fortunately, this was a fairly easy replacement, and it only cost a whopping 4.95 for a new thermocouple!

So the water heater limps on, and we have hot water again. But the whole event got me thinking about replacing our 14 year old water heater when we redo the rest of the plumbing in the house. I've heard about tankless water heaters for awhile. They've become standard in green building technology. Low water usage, no standby heat loss (you only heat water as you use it, "on-demand", instead of constantly heating a 50 gallon tank of water all the time), and very small space requirements. The technology has been used elsewhere in the world where water is a premium (Europe, Japan), but has only recently caught on in the US.

An excellent overview of how tankless water heaters work is provided on the Takagi website, as well as other providers (Bosch, Rinnai, Paloma). Basically, you never run out of hot water... the tank can always heat water on the fly. The biggest disadvantage is that you need to get a large (read: expensive) tankless heater if you expect to have more than 1 "major application" at a time. This means 2 showers or 1 shower + dishwasher. Most can support 1 shower + a sink. But they last a LONG time, manufactures claim 20+ years. Some people say even longer.

The only other bad thing is the initial cost. It's about twice as much as a traditional tank heater. For a model that provides for 2 major applications, it is about $1000 (they also need special ventilation too). But part of this cost can be offset since because they are about 85% efficient, they qualify for a $300 energy credit for next year's taxes.

All said and done, I think the pros may outweigh the cons. In addition to the cool sustainability points for being green (and saving greenbacks in terms of nat. gas costs), I really like the space efficiency aspects. We'll have to do more investigation on these tankless units. Any feedback or insight is welcome!

Monday, May 15, 2006

Time keeps on slippin, slippin, slippin, into the future .....

We finally sat down and did a schedule for the upstairs. The finish date is soooo far away. But at least we're being realistic!
Remember, this is ONLY for the upstairs. I am determined to start the kitchen before the end of the year.
I can't believe I know what we're doing every weekend through the end of October.
We did build a couple of spare weekends in, I think. Not a lot. Erika better have that baby on schedule, that is all I have to say! :)

MAY
May 20 & 21: Siding & Painting Garage
May 27 & 29: Finish Upstairs Demo (sat Frank Tribes show)

JUNE
June 3 & 4: Final Dormer Preparations
June 5-9: DORMER HIRED WORK - framing, cut roof, install skylights/tubes
June 12-26: DORMER HIRED WORK - install flooring, repair roofing
June 17 & 18: Erika's Due Date
June 24 & 25: Nici? And Plumbing .... (John)

JULY
July 1 & 2: Interior Framing for dormer
July 7?: install Heating (Chris)
July 10?: electrical upstairs (Fred)
July 15 & 16: Insulation
July 22 & 23: Drywall
July 29 & 30: Drywall

AUGUST
August 5, 6 & 7: Drywall
vacation!
August 19 & 20: Tile
August 26 & 27: Tile

SEPTEMBER
September 9 & 10: Finish Plumbing, Muddy Buddy Weekend (Jen & Scott to kick some butt)
September 16 & 17: Paint (at long last!)
September 23 & 24: Finish electrical
September 30 & October 1: Flooring

OCTOBER
October 7 & 8: Trim, Frank Lloyd Wright Races
October 14 & 15: Finish the trim!
October 18: We move in, our third anniversary
October 21: Upstairs Halloween Party!

Tuesday, May 02, 2006

Starting off on the wrong (left) foot

While awaiting estimates from contractors to frame our dormer, we've begun to take advantage of the still-cool weather to work with the unpleasant work of demolition. Actually, this was planned for a couple of weeks, but we first had to relocate many of the things being stored in our attic. I forgot how much stuff we had up there, so we didn't really get started until this past weekend.

Where would we be without Scott and Julie? They came over Saturday afternoon to lend a hand... and ended up contributing a foot! A foot, you say? Yes indeed, a foot. And a leg too!

Let me explain. Shortly after their arrival, Jen and Julie went to pick up some supplies, while Scott and I removed the carpeting stored up there. After about 5 minutes, we were almost done with this task. On the final trip, we walked across the floor, and suddenly I heard a bursting crash behind me. When I turned around, Scott was about 36 inches shorter, as his left foot had found one of the spaces without any subflooring, and gone straight through our dining room ceiling!

Fortunately the poor guy managed to come up unscathed, which is no small feat. Also fortunate was that this did not happen 10 minutes earlier, when Julie was sitting in the dining room closely under the soon-to-be extra skylight.

We actually covered the whole with an extra piece of drywall and cleaned up before they returned from the store. I know, i know. I should have taken a photo earlier. Oh well - maybe we can recreate it.

Honestly, I figured that sooner or later, someone (most likely me) was going to poke a hole in the ceiling since we have to redo the entire floor up there, so it's probably a good thing we popped the cherry and got it out of the way. Poor Scott felt pretty badly about the whole thing though.

I think he worked extra hard once we got past the unintended demolition and started working on parts of the second floor we actually planned to demo. :)

We managed to get a fair amount accomplished once we covered the floor upstairs :) What will be the master bedroom is completely gutted to the point we need it, except for the floors. Julie even ripped into the wall with a sawzall to make room for some built-in storage! So by the end of the day, we not only increased the ventilation between the first and second floors, but also got some things done!

Thursday, April 20, 2006

Now that's a right proper back porch ....


Happy with no teeth
Happy here in hibernation
Slurpin' on a peach
Starin' at the situation
Kitty at my foot
Meowin out a conversation
Rocking back and forth
That's my only destination
- from "Back Porch" by Presidents of the United States of America

That's right, folks. Since as far as the top floor goes we're kinda stalled out like the old zeldamobile at a four way stop until we get some contractor quotes, we decided to look for other ways to occupy our time.

RING RING RING. 9am Saturday morning. "Hey guys, it's Julie. You got anything I can smash? I'm in a smashy mood."

I eye the back porch through the grogginess of half-awaketown, and say "Sure. Bring a hammer."

Viola .... DESTRUCTION, properly sanctified by the fact that it's a 100+ year old porch in need of some serious attention. Like, now. So thanks, Julie, for kicking the porch screen's ass into oblivion. That, and for the Brokeback Mountain. :)

While it's still a far cry from finished, at least we got it started!!!

Tuesday, April 18, 2006

Meeting Approval

Yes! After a year long process (okay, so it wasn't honestly top priority all the time), we have finally put together a set of plans for our attic remodeling, dormer addition, and bathroom that has met the excruciatingly detailed criteria for our local building department, and received... a PASS!

Yes, they stamped the heck out of the plans Jay drafted up, with multiple large stamps for inspections, rules for revisions, and whether the plans are a job copy or village copy. Unfortunately, I don't have any photos of these happy black & white drawings with red stamp ink all over, as they will hold them until we get the actual permits, but still! Approved plans!


I've put a photo of one part of the plans here (click for a bigger view). This is mostly structural drawing showing how the new shed dormer roof (upper-left) will be supported by the rest of the building. Once we get the job copy plans, I'll take more photos of the overhead view.

So what's next? Well, knowing that we move at much slower pace than professionals, we're investigating subcontracting certain components of the project. Here are the different phases we'll need:

1. Demolition (friends always seem to love this part). Substeps include, floor, ceilings, and exterior
2. New floors. Not just subflooring, but all of our floor joists need to be sister-braced (doubled-up) with structural LVL lumber, since the existing 2x6 joists are so inadequate.
3. Exterior work. cutting open the roof, framing the dormer, adding skylights, roofing it, siding it.
4. Interior framing. New partition walls throughout
5. Insulating.
6. Plumbing. John already did the laundry room, but we're adding a master bath so...
7. Electrical
8. HVAC
9. Drywall
10. Painting and Trim. This is what Jen loves most. In fact, it's probably what is mostly on her mind when she thinks about the upstairs :)

So, a wieldy project, but its warming up, the plans are set in stone, and its time to get cracking!

Monday, April 10, 2006

A Fairy Tale State of Mind ...

Friday is our big meeting with the EV over the upstairs redo. You know, sometimes I forget that the second floor is even there; we've spent so little time up there doing much besides ripping walls down that it's hard to imagine a time will come when most of our evenings is spent ten feet above the ground. I was trying my best to visualize this today, squeezing my eyes shut and imagining the fabulous built-ins that hold sweaters and socks and shoes in the tranquil and non-cluttered master bedroom, the incredible bathroom that will provide hours of zen-esque relaxation in that bubbling 6-foot bathtub, the east-facing bright and airy guestroom that will flood with sweet pale morning sunlight to arouse our overnight visitors from a very restful slumber .... then I opened my eyes and the fairy tale fizzled like a balloon popped with a tack.

Really, it's not that bad. Well, not once I get it out. Ha. I'm finally beginning to see the structure in my head for the kitchen, it only took four months for me to be able to visualize it all, so I'm doing better.

Monday, March 13, 2006

C'mon get happy ...

So we were at last successful. No more with the curb madness. I contacted the village manager's office and the curmbly sloppy-arched curb was removed and replaced within 48 hours. Gotta love it when someone can just (finally) make something happen. I also received several phone calls from the new streets manager - sounded nice. The guy we had been dealing with is no longer around (surprise, surprise). Yay for the curb!

There have beena few developments since our last posting. We've managed to redo the plans for the upstairs (THANK YOU VIV FOR ALL YOUR HELP!) and submitted them to the village for their hopefully timely consideration. I can't wait to make some progress above ground. I am feeling caught again lately.

We need a plan. I told Jason this the other day. We used to have this big white board we could put finish dates on, cross off completed projects and look forward to new ones. I don't know where it went, but we gotta find it again. That was like my security blanket, I think. I just didn't know it at the time. Guess you never do till it's GONE!

I just can't wait till we have the bathtub installed upstairs. Right now our water heater can't hold enough hot water to fill the tub on the first floor. How sad is that? SIGH ... but the new tub, that will be awesome.

Tuesday, February 21, 2006

Escalating the Curb

After 143 days, we've become sick of the questions and furtive glances from the neighbors, so today we decided to let the neighborhood know that the construction horses in the middle of our block are not ours, but instead are brought to us by the village's Public Works department. We handily included the dept contact number as well.


Jen also left (another) message with the "village manager" regarding this. It should be noted, however, that we don't really want to start a war; we just want resolution.

Monday, February 13, 2006

If we had a balloon camera...

Then this is what the view from Humphrey House would look like peering East towards Chicago, with the skyline on the horizon (9 miles away).

Thanks to Google Earth though, we can now just show you virtually. What a view!

Thursday, February 09, 2006

DIY Appraisal

I like knowing about real estate appraisal, and the tech tools appraisers use, like this new website:
www.zillow.com

While the price for HumphreyHouse (in its current condition) seemed too generous, the trend graphs and data available here is truly amazing. It even lets you select your comps and make adjustments (like for a finished basement, for example) just like a real appraiser. And integrating hi-res satellite imagery as an overlay was a neat bonus!


Reposted from WSJ's Real Estate journal:

There's a new, well-designed, free online service for finding the value of a home that doesn't require you to identify yourself or to communicate with an agent or broker, and provides heaps of information directly to consumers. It's called Zillow, and it is launching today, in beta, or test, form at zillow.com.

Zillow uses data such as tax records, sales history and the actual prices of "comparables" -- homes in your area that are similar to yours -- to come up with an estimate, which it calls a "Zestimate." It backs up the estimate with lavish data -- aerial photos and maps showing prices in a neighborhood; loads of charts and graphs displaying historical data and price movements, as well as details on the size and room totals of a home. It even allows you to enter information, like the types and prices of recent renovations, that might change an estimate.

Wednesday, February 08, 2006

What the heck happened to HumphreyHouse?!?

Dear constant reader. We're sorry to leave you craving for updates as to the inner workings of Humphrey House. I think we're still hungover (exhaustion. not just drinking!) from the holidays. It seems more like Hibernating House lately as the few activities we've done have been efforts to prevent heat from escaping and cold from entering. It's amazing how much heat you can keep in by placing a tarp over a stairwell!

Speaking of stairs, we need to start thinking up them. While our original plan was to take the renovation one level at a time, bottom up, we've reconsidered. After seeing everthing involved throughout the basement construction, it would be a shame to finish off our kitchen, and then risk ruining it when taking things in and out for the second floor dormer addition and related work.

So, its back to the drawing board, or drafting table as the case may be. Jay has dusted off the original drawing prints that Vivian began, and has started modifying them. Key among the changes is the removal of 9" from the planned dormer, in order to require with zoning setback requirements. We lose some bathroom space width-wise, but we "might as well" (3 very dangerous words) extend the length from our original planned 12' to 18' total, allowing room for a walk-in closet off the master bedroom.

Erasers fly as Jay space plans, considers plumbing runs, and of course ensures the structure is supported. At least we have some better guidelines after going through the first round of building permits last year. Oh, and how cool is this? Minneapolis kindly showed us what is need to issue a permit for a shed dormer. They have tons of these recommendations! We can only hope OP has the same requirements.

Friday, January 20, 2006

Men At Work ... or not so much ...

I'm indignant. I'm howling with righteous fury. I'm seething with sanctimonious anger. What the bloody hell does the Evil Village think they are doing to my lawn?????

It began with a phone call. Well, sort of. If you check out the archives, back in September we had our water line replaced and upgraded to larger service. The EV (Evil Village) got wind of what we were doing and decidedto replace the water main since we would already had a huge hole in our yard. So they did. They removed the curb to access the water main, and then put a sheet of 4 x6 plywood over the six-foot deep hole. And then we fell off their radar. If you check out Halloween, our yard was extra-scary with the giant PIT OF DEATH.

So, we did what anyone else would do. We called. And called. And called. The second week of November, the hole in the yard was filled with pretty black dirt culled from god knows where, but the curb remained a straight shot down into muck. A piece of the plywood remained, now torn in half so six-inch splintery spikes shot straight up in the air, conceivably to warn passerby that you didn't want to screw with this parkway.

November 15, a call back from the public works dept that the concrete job had been contracted out and it was expected to be finished within two weeks. Uh-huh. I bought it, really I did. Yeah.

More phone tag ensued. November turned into December. Mid-December, and during six inches of snow, the lovely orange and white construction horses that had warned people who parked near our house "Beware! Hazard to your health lieth here! Stay clear!" disappeared one day while we were at work. The spikes and curbhole were hidden beneath six inches of snow.

Hello, lawsuit! I could see it now ... "I parked my Beamer just in front of the house, and my wife stepped out of the vehicle onto the snow where the curb SHOULD have been, and instead fell inside a foot-deep hole, cut her leg on wood spikes, requiring sixteen stitches, and broke her ankle when her foot landed sideways on a bottle of Colt 45!" Would we be liable? Would the EV step up to the plate? Had I had enough of this crap?

Yes.

So I called. And called. And called. Finally, I freaked someone out enough and was assured that the construction horses would be returned by 4pm the next day. No matter what. As for repairing the hole, that would have to wait till the ground was less frozen. I agreed. So we got horses back.

Three weeks later, we were in the middle of a record-setting warm January. And still no action on the yard. I decided to call every hour on the hour. When they realized I wasn't going to go away, I was finally put in touch with a manager person who admitted we had been lost. AGAIN. He assured me that people would be laying concrete and fixing our curb that week. And I believed. What a sucker.


As you can see, we've got a few problems here. Biggest one: I didn't need a new abstract lawn ornament. At least not till I figure out the rest of the landscaping.

They better come back and fix this. They just better. Again with the righteous anger, the seething fury, the raised fist in the air.

"With God as my witness, I will never believe the EV again!"

Saturday, January 07, 2006

HAPPY 2006!


(julie ringing in the new year in the basement of the humphrey house)
OUR TOP TEN 2006 RESOLUTIONS:
1) have more parties in the swank/swell basement, with hopefully lots more comprimising photos (special thanks to frank, scott, michael and especially julie for my favorite)
2) gradually move into the basement to prepare for the upcoming kitchen overhaul. wish we had a bathroom down here, though.
3) update this thing a little less sporadically.
4) watch the bears win the superbowl.
5) remove the aluminum ladder from the hallway. it's just tacky.
6) have at least one non-house based conversation with Significant Other every day.
6) jen resolves to learn not to be afraid of the nailgun.
7) jason resolves to wear protective clothing/masks when working with fiberglass insulation.
8) build a new kitchen. very very soon.
9) avoid painting any more rooms in the house purple.
10) express to our friends & family more often how grateful we are for EVERYTHING.