Are Garbage Disposals Green?

This is a question I briefly pondered during our kitchen remodel. Now that we (Jen) are starting to get into gardening, we will likely get a composting bin, which we'll do once this record-setting winter finally passes over Chicago. But gutting our kitchen gave us the opportunity to get a garbage disposal too.

During the deliberations, I noticed an overstock In-Sink-Erator came up on eBay a few months ago, I splurged for it (and was later told by the plumber that I got a good deal on it). Now that it is installed, a few times I have flipped the switch and wondered how it impacted the enviornment.

Well one of my news feeds recently carried an article by the WSJ about this topic. At first, I was surprised to hear that some countries (UK, Japan, Australia) actually had legislation prohibiting the installation of garbage disposals. I was even more surprised that many are now repealing those laws and encouraging people to install these in their homes to help deal with the issues they're running into with solid waste management.

There is also an good overview of the environmental pros and cons of disposals:

Pluses: "Carting organic waste to landfills contributes to several problems. It requires using garbage trucks, which spew pollutants. In addition, mixing food waste into garbage can make it more difficult for sanitation workers to sort out recyclables, and more energy is required to incinerate the water-laden refuse. And most importantly, landfills themselves produce a lot of methane, a potent greenhouse gas."

Minuses: "Sending food waste through a kitchen garbage disposal, however, creates a different set of headaches. It increases water usage slightly, according to several studies. Engineers worry that as the waste passes through municipal sewer systems to treatment plants, the ground-up food sometimes contributes to clogging. And after treating the waste-water, plants are left with more sludge, which is costly to dispose of."
Most interesting to me was that the USGBC is considering awarding LEED points to homes with a garbage disposal. There is even some really advanced Swedish engineering that separates solids from water after the disposal has done its duty, and then takes the solid waste and uses it to create methane, effectively turning waste into energy!

As for the typical US home, most antiquated existing waste water treatment centers couldn't handle that volume of mixed food/water and would be overwhelmed. This is actually a concern expressed by other residents of our old condo building. People feared the sewer lines weren't large enough to accommodate everyone having a disposal.

Anyway, here at Humphrey House, we'll likely use a compost bin for most of the year and save the disposal for small pieces of food. And for when it is too darn cold to go out to a compost bin in winter!
Articles:
http://www.realestatejournal.com/homegarden/20080227-brat.html
http://www.treehugger.com/files/2008/02/trash-talking-the-garbage-disposal.php

Monday, November 19, 2007

Dad was Right

All of our dads were right, actually, as we discovered last weekend.


KENNY

Kenny had come up with the new kitchen layout right away, even though Jen and I (mostly me) tossed, turned, twisted and tried to come up with a different idea for 2 1/2 years. When we had a professional designer lend his opinion, guess what? It was almost identical to Kenny's plan!

JOHN
Then last weekend, John came and routed our plumbing for our kitchen sink. When the Today Show filmed us removing cabinets, we learned two interesting things.

  1. The kit sink was originally in the corner of our kitchen (on the bathroom wall, which meant only one plumbing wall).
  2. When some PO last remodeled the kitchen (circa 1952 from newspapers we found in the wall), they moved the sink. And ran the water supply lines on TOP of our floors in that little space under the cabinets.
As John likes to say (with a touch of sarcasm), "They don't make 'em like they used to!"

We ended up gutting out the last of the old galvanized steel pipes in the house so now there is nothing but copper (and water pressure everywhere!) By the the time John left it was very late, but we managed to squeeze in hooking up the gas line for our new dryer in our second floor laundry area as a final project. Which was useful, because the next day, we went to Jay's dad's house for an early Thanksgiving. Not only did we leave with full stomachs, but also a bed full of new laundry appliances.

BOB
The new house Bob & Kathee moved into had a nice Fisher & Paykel washer and dryer in it. However, it was all EcoSmart and computerized, made weird noises, blinked a lot and paused in the middle of washing a load. It was too frustrating for them, so they bought new appliances and offered us these temperamental appliances if we wanted them.

Since we both earn a living via a computer, a computer-controlled laundry machine didn't really seem to daunting to either of us. At least, until we hooked them up and washed a load.

Actually the first load went flawlessly. I was busy running up and down the stairs trying to make sure that all the insulation I packed into the floor last year was doing a good job of muffling the sounds of suds from the dining room below. It was amazing! I couldn't hear a thing! Then came the bedroom test (a regular 2x4 wall with insulation is between the laundry and our bedroom). Almost nothing! Fantastic! I was very excited and pleased. And the washer and dryer were Energy Star rated too!

But when Jen did the next load, when the machine gave up halfway through the wash and started a monotonous beeping noise and flashed all kinds of lights. "Aha," I thought. "This is what Dad was talking about. I'm sure it's something simple. Let's consult the manual" (which I had printed earlier).

Things quickly devolved. Hot and cold supply lines not supplying water? clearly not the case as one wash went through without any problems. Could the angle of the drain hose really prevent the machine from properly executing a rinse cycle? Seems outlandish, but who knows.

At this point, we have done approximately 7 loads of laundry, and sadly, I think we have only had just the first instance that went off without any interruptions. So it seems like it's time to consult the Search Engines to see who else is running into these problems.

Nevertheless, I think it's definitely safe to say our Dads were all right. It's been a humbling month so far.

Thursday, December 14, 2006

Stud-ly help before the drywall comes

Monday morning, we had our drywalling contractors come to begin finishing our attic. The only problem was, we weren't ready for them yet. There was still the shower to frame, closets to build, and several other punchlist items to take care of. I knew it would be a long hard weekend.

Shower PanSaturday began early with John showing up at 8:30 to reroute the plumbing vent for the shower drain (which was finished before the wall was built, and was inside the shower area). He also brought some thick 40 mil liner that we lined the bottom of the shower with to create our custom shower pan. This liner will be the last line of defense for the ceiling below in case any water gets underneath the tile that will be the base of the shower. Due to the zoning setback requirements, our bathroom addition got squeezed a bit, and it will likely be most noticeable in the shower, which will be 30" wide. Hopefully making it 42" long will help compensate for the narrow width. It will be tight, but I think we can make it work. While John was here, we also ran a 1/2" copper line from the basement to the bottom of the shower area. This will be for the steam generator we purchased that will give us a much-needed retreat after a hard day's work! I can't wait for to try that out.

Saturday bonus: Our tub came in earlier than expected so we received it with the drywall delivery on Saturday, so while John was here we moved the tub up and mounted it (screwed) into place. We didn't have all the parts to hook up the drain yet, so there's still some work left, but at least we know what we have (and what we need) now!

Shower with plastic vapor barrier, from the outsideSunday was the big day that was our deadline. There was two day's worth of work to do in one day, so I did the only thing possible to help: I hit the Easy Button and Scott and Julie came over to help us wrap things up. They began by wrapping the interior shower ceiling and walls in plastic sheeting that will keep moisture from the steam getting to the wood underneath. We also carved out a niche for shampoo bottles, ran some speaker wire, put interior glass block windows to brighten the rooms, and Julie got to play stud-finder and marked stud locations on the floors for future reference. Of course, we had to clean everything up and move everything out so the drywallers had room to move.

But we did it. We wrapped everything up by 8:00 and we were ready for the drywallers to come on Monday.

And then at 10:30 sunday night, after looking over everything one last time, Jen asked, "So, how do we turn the steam shower on and off?"
"There's a separate control," I replied.
"Oh ok. Where is it?"
"It will be on this wall of the shower, and goes on after the tile is installed. Then you just connect it to the control cable right here... Oh wait a minute. The cable isn't there! Ahhh..." I screamed, realizing I had to run the cable really quickly.

So, we were finally ready just before midnight. But hey, we still met the Monday deadline!

Thursday, July 06, 2006

Plumbing, Take 2

Well, I now feel like I could act as a plumbing consultant (at least for OP village code) to ensure that everything comes into compliance. Educational experts always say that the best way to learn is through failure. Well, that's what happened to us, along with a whole lot of extra work. Good thing we had the extra time from a holiday weekend.

We started off by demolishing (yet another) wall in our kitchen to expose the cast iron pipe. The old vertical stack needed to be replaced since we were cutting out a section of it below. That was a bear of a job, but a special chain pipe cutter that John brought made the job easier. Unfortunately, in order to remove the old stack, we also had to replace the 1st floor bath toilet drain which was molded into the old cast iron pipe. Of course, in order to fully reach that, we had to drop one of our HVAC supply ducts in the basement. Then we were finally able to start chiseling out the old drain, which was embedded in the 3-4 inches of concrete "subflooring" under our first floor bathroom. It's hard to convey just how hard this whole process was in words, and, sadly I did not take any photos before the cast iron was removed. But the whole process took the better part of Saturday, if that gives you any idea. By the time the pipe was out, we had just enough time to run the new PVC pipe from the basement upstairs, and reconnect our toilet.

As you can see, things started to get messy and complicated in the basement utility room with all the PVC pipes from upstairs connecting in to the stack.

After failing our inspection last week, we learned we could purchase a copy of local building code amendments for "a nominal fee". Turns out that it is only $5.00! Well worth the investment, and something I wish we'd known of earlier. It will definitely come in handy as it contains the amendments for ALL building codes, not just plumbing.

So on Monday, we moved on upstairs and rerouted all of our "improper" venting in the attic. We did this early in the morning (8am!), which fortunately turned out to be relatively cool up in the attic while it was raining. By the time the showers passes, it was noon, and we had completed everything except pushing the pipe through the roof (finished later that afternoon).

Then it was down to the basement, where we were able to devise a monstrous maze of piping. (photo coming soon) Why so complicated? In order to make sure every little nit-picky thing that we could be failed for was taken care of so there was no chance of failing the inspection again.

And guess what, when the inspector came at 10:30 this morning, he was very pleased to see everything was so well done and completed correctly. So, now we can continue with flooring and framing!

Monday, January 03, 2005

Plans (cont.)

"Now that we have covered Kitchen remodeling, what other grand plans do the two of you have on your new house?"

Glad you asked!

We really miss having two bathrooms, and with four bedrooms (even three if we remove one to expand the kitchen), we really need to get another one in there. Plus, we don't really feel like going up and down two flights of stairs for each load of laundry.

So we're planning to put a 13 foot shed dormer on the north end of the house, to feature a new bathroom. Good thing Jay's mom is a bath designer and his stepdad is a plumber! Talk about a match for the ages :) She is presently furiously transcribing the vision into reality on the drafting table so Jay can take blueprints over to Village Hall tomorrow and submit plans for the permits. Thanks so much Vivian!!

Anyway, the photos are to big for the blog, but here are links to our plans (will open in new a new window).

View Existing First Floor

View Existing Second Floor

View Revised Second Floor

New Bathroom Plan:


Kinda rough, but at least it gives you something to go on :)

Did you see those Winder stairs? Man those things are scary going down - especially if you're carrying anything and can't see below you.