These are Some Serious Windows

Working in the field of green homes is both a blessing and a bit of a curse. It's great to establish contacts with people that understand healthy indoor air and energy efficiency, but when you live in a 1920's house you realize there are a lot of improvements that can be made.

One thing we had done a few years ago when we finished our second floor was install some storm windows on the original windows in the master bedroom as I really liked the vintage glass and look. The storm windows helped a bit, but after several winters sleeping next to this cold surface, it quickly became apparent that we had to look for something that would perform better and be more comfortable for us. Especially since the windows take up the majority of the wall. So not only did we want comfort, but if I was going to buy windows, I want the best performing windows I can get while still keeping the historic look of the front facade of our home.

I spoke with Andy Scott from Energistics, who is both an energy rater (building science specialist) as well as a distributor for Serious Windows,. Who better to advise than someone who has the tools and training to make informed decisions about building performance? Andy helped me get the remodel-friendly and affordable vinyl option (Series 501) with mullions that divide the top sash into three panes of glass to help keep the historic look.

What makes these windows particularly good is a suspended film in the glass that helps reflect back unwanted heat from the sun - an important issue that is usually difficult to control for West-facing windows receiving afternoon heat. The windows have a U-value of 0.21, which means there R-value is 4.75 (1 divided by U-value = R-value). Even though they are vinyl, the frames are very well insulated (rare for vinyl windows). This is very good for a window.

Since we were adding windows, I also had Sustain-a-building install these windows. When removing the old windows, they took advantage of the work to dense-pack cellulose above and below the windows to help keep the room even more comfortable. It still amazes me that most homes built in the 1920's do not have insulation - energy must have been very cheap back then! Before installing trim, the guys used Great Stuff Window And Door Foam around the seams to ensure a good airtight seal.

We also recreated the craftsman-style built-up trim / crown molding used on our kitchen remodel and the nursery trim so the house has some good continuity now. Here's a nice detail shot for you trim aficionados:

The trim pretty much consists of 1 x 4's. The top casing piece has a small bullnose addition that wraps the 1x4, and then the addition of a crown molding piece above. A flat 1x3 caps off the crown for the finished look.

And the result if we take a step back in the room and admire the work? Absolutely stunning. We may not even get curtains (just shades) since this looks so good!


From outside, the windows are bit brighter than the "Craftsman tan" paint we used on the windows on the front porch so they do jump out a bit. I haven't yet decided if its worth painting the new vinyl to match or not, but for now its much better than the older brown that just looked like the windows faded into a black hole. The view from the street certainly looks much better, and I know we're going to be very comfortable next winter thanks to our Serious Windows!

Wednesday, April 27, 2011

Paint can be Non-toxic

We have some very good news to share - our home will soon be a little fuller this summer as we welcome a newborn to the family. So at Humphrey House we've begun what will soon become a flurry of activity preparing for baby.

One of the first things to tackle was the room we'll be using as the nursery, which is one of the two bedrooms in our converted attic. This former guest bedroom needs a makeover - and finished off (windows were never stained or trimmed!). Nothing motivates you to finish a punchlist quite like a deadline. I had to first actually finish mudding and taping the drywall around the windows (which had never been done and for three years has been craftily covered by curtains).

Once the walls were ready, we naturally wanted to paint and found that we are definitely trying to create a safe healthy room, so when evaluating options, we went beyond "typical" green paints that focus on low emitting levels of VOC's (volatile organic compounds). These VOCs can be very harmful to human health. We have been using Low-VOC paints before for our kitchen remodel, but with a newborn that takes many more breaths than an adult, we wanted something as safe as possible. The fact is, most low-VOC paints still are toxic. So we decided to go with a paint that not only has low VOC emissions, but also is made from non-toxic materials, called AFM Safecoat - which also does not have any formaldehyde. It was $10 more for a gallon than regular paint (we needed just one gallon). Is it worth an extra ten bucks to know the air is free from formaldehyde and other toxins, less likely to cause chemical sensitivities and asthma in our baby? Yes. I see this decision as very cheap insurance.


We went with a nice bluish-purple for the walls that Jen likes to call a "shade of periwinkle". I like the color selection because this particular color looks different in daylight vs artificial light so gives some variety to the room. In terms of installation, the AFM Safecoat paint does roll on the walls a bit differently - a bit more loosely and not as firm. So it take a bit more effort to apply. It also was pretty thin on the first coat, but incredibly deep after two coats. Jen was quite happy to see the "old" (a mere 4 years) yellow walls go away.

It's worth noting that just because it is non-toxic low-emitting paint doesn't mean it is low emitting before it is dry. There is an odor that is less offensive than regular paint, but still noticeable for a few days as the paint cures. But now it's virtually undetectable.

Next, we'll have to tackle the windows in this room which have been unstained / unpainted for nearly four years(!) and then trimmed out. Then we'll be ready for some nursery furniture! But of course the impending arrival of the baby means its time to polish off several other items on the wishlist punch list, so there will be more to follow.

Wednesday, May 09, 2007

Invasion of the Spheres

When designing all the things we wanted in our upstairs remodel, we thought of all kinds of neat inclusions such as:

  • Centrally wired in-ceiling speakers: two in our bedroom, one in the bath, one in the spare BR.
  • Flush globe fixture in our Bedroom, when we're not using our romantic sconces.
  • Suntunnels, which let in so much daylight we don't turn on lights during the day
  • Recessed lights in areas with low (7 foot) ceilings (hallway, spare BR)
  • Required safety - hardwired, interconnected smoke and carbon monoxide detectors
All different systems that sound cool and function pretty well, and keep it from feeling less like a dark, cramped converted attic and more like bright, airy living space.

UNTIL...
You awaken from a wild dream, and, upon opening your eyes, are briefly are tortured by an onslaught of UFO's flying down to you. It's an invasion!



Had I known that these spheres would provide a celestial effect and remind me of Spheres, we might have totally exploited it and intentionally lined things up mimicking planets with moons and planetary rings, an entire solar system, or even an alien invasion! Since it may be difficult to imagine, I have a color-coded key for you:
Green = ceiling speaker
Yellow = suntunnel
Blue = recessed can light
Red = smoke detector
Purple = smoke / monoxide


Scary, isn't it? And that's without adding in the Spheres in our master BR!

At any rate, this certainly is yet another interesting byproduct of HumphreyHouse's evolution.

Monday, May 07, 2007

Finally out of the dungeon

While we've enjoyed the fruits of our labor from two years ago, it is nice to depart the dwelling space of our basement and finally be able to ascend to the second floor. Yes, that's right, our 2nd floor remodel and dormer bath is complete.

We managed to finally pass all our inspections (after multiple attempts), including the Final Building inspection today, and we can now inhabit the area as living space! I really don't know if the emotions can properly be put down into words, so here are some photos of the finished space.

The master bedroom...


Looking down the hallway to the 2nd Bedroom (love the salvaged oak doors we found for our laundry area!)...


And the cool serenity of our completed bathroom...


I'm sure Jen will find more photos to post, but I couldn't wait to get something up. Now we have a nice peaceful area to live in while we dream, plan, and work on creating a kitchen for the first floor.

Monday, April 02, 2007

So close, so close ...

Enjoy the show ... comments welcome ... we're hoping for final inspections this week so we can finish and move upstairs! YAHOO!

Monday, March 19, 2007

let the sun shine in ...

So much light! :)

Tuesday, December 19, 2006

Wall covering has come

Drywall started magically appearing on the walls of our attic. At least, that how it seems when you leave for work and come home with new walls! What a difference hiring the pros makes - talk about the ultimate Easy Button!

Our garage was full of drywall - 70 sheets! - at the beginning of the week and we're down to about 10 now (sidenote: always buy extras for any project. Going back to return unused merchandise is so much more rewarding than running out to get more of something in order to finish the job!). We're installing several different types of drywall:


  • Standard 1/2" 4-foot by 8-foot sheets on the walls

  • Standard 5/8" 4-foot by 8-foot sheets on the ceilings

  • Standard 3/8" 4-foot by 8-foot sheets on top of older damaged 3/8" drywall in our stairwell

  • 1/2" 3-foot by 5-foot cementboard (Durock) in the shower and tile area surrounding the bathtub

  • Moisture-resistant "greenboard" 1/2" 4-foot by 8-foot sheets in the bathroom


The most interesting is the cement-board and greenboard in the bathroom. When Sara came by and saw the greenboard the other day she said "wow, you've already started painting in here!" Sorry Sara, but not quite. "Greenboard" contains an oil-based additive in the green colored paper covering that provides moisture resistance. Since we're adding a steam shower in our bathroom, we're making sure every surface has this installed.

The cement board, while difficult (and heavy!) to work with, is much better for wet water areas like our custom sized shower. Greenboard is not suitable for backerboard in this instance, and as of 01/2006 is no longer accepted in building code (International Residential Code R702.3.8). So grudgingly, I admit that building codes have their uses. I don't want to lean against the wall while taking a shower and have my hand fall through it like others have done.

So now that most of the wallboard is installed (only cementboard to go), our crew is working on the next step - plastering all the joints and screwholes. And then comes the messy part - sanding. I'm already trying to seal off the rest of the house so we have at least some kind of dust-free zone.

Friday, September 01, 2006

Welcome To Humphrey House University ...

Looks like this weekend is gonna be a worker after all. Our previously scheduled plans to celebrate Jay's dad's b-day have been scrapped due to dog fungus - yes, you read that right - so we've got a three-day weekend to fill. Since I've been on house hiatus for a while now, I think this weekend will serve as a good educational tool for me. Classes planned include:

  • Experiments in Drywall 201 - I passed Drywall 101 during the basement phase, so I should be ready to learn a bend. Of course, I realize I passed only because I was the sole girl, and because at least I didn't do what Scott did on his first sheet and put the drywall on backwards. Regardless, we've created these little glass block niches (we just like our glass block, dammit) that we need to wall in. However, we don't have the lovely screwguns like before so it may not be as much fun ...
  • Studies in Shower Scenes & Toxic Fumes - For too long, we've lived with a bizarre situation: A wood-framed window painted shut in the shower. While I no longer feel (too) self-conscious showering in front of a five foot window that's five feet from my neighbor's living room windows, the lack of ventilation in this, our only bathroom, has been suffered through too long. Having to wait an extra ten minutes after waiting for the bathroom all morning just isn't working. The window must be replaced! We've got a glass block window, complete with vent, ready to go - just haven't had the time or focus or whatever. Bring on the tile destruction! Let's go!
  • Fun With Screening - I had to re-screen a window when I was in college and my sublettee's son played with razorblades and hacked out pieces of my screening to spell out his name (at least the first two letters before he got bored). So this is more of a refresher course. I want to rescreen the windows on the front porch so we can open them all, not just one. It'll be fall soon, and I'm so looking forward to that breeze blowing through the porch into the living room with yellow leaves falling outside. Which brings me to ...
  • Organizing Your Life For The Clutter-Prone - I've taken this class many many times, thank goodness repeats are allowed. The front porch needs some serious attention. After all, Halloween is coming, and how can I be expected to maintain our "Halloween House" status if the front porch is covered in boxes of Care Bears, weight benches, old purses and my art supplies?
Hope I graduate soon ...

Sunday, July 30, 2006

Piping for 13 hours

Saturday was quite possibly one of the longest days working on our house. Or maybe working in an attic during the 105 heat index made it feel even worse. The day started off well (and cool) enough, as our electrician Fred showed up as promised bright and early. After walking through the details with Jay, he put together a shopping list of a few extra items that Jay had not already picked up.

While Jay ran to Lowes, Fred started drilling through walls studs, sawing 1/2" metal conduit with a cool cordless bandsaw (which Jay promptly nicknamed "The Green Machine"), and contorting metal conduit into all kinds of funky shapes. Smartly, Fred started working on the non-A/C side of the attic first (the side that faces West and will be the master bedroom). He had most of the bedroom complete by the time Jay returned.

In the past year since Fred wired our basement, Jay had tried a few times (mostly unsuccessfully) to work with conduit and the pipe bender he has. Now, Jay was a willing apprentice as Fred tried to teach him some of the tricks of measuring and bending conduit. With a little help, it actually wasn't too bad. Jay ended up doing the stairs, half of the hallway lighting and smoke detectors, and half of the spare bedroom before the day was done.

Granted, that is only about 15% of the work and Fred needed help on some things a lot, but still, not too bad for an amateur.

By 5 o'clock we started moving slow as the heat sunk in and the A/C struggled to keep up. But Fred was determined at that point to get all the piping done before he left for the day. We pressed on, figured out a way to route the conduit down to the main circuit panel in what's termed the "homerun". I thought Fred kept referring to the Cubs spanking the Cards until I figured that out. Additionally, the centrally-wired smoke detectors will need to be wired into existing smoke detectors in the basement, so that required another pipe coming downstairs as well.

Then we determined that we were out of conduit. We'd already gone through about 450 feet of pipe(!) but needed another 40 more to finish the spare bedroom. Mostly this was because an earlier pipe Jay had run before the floor was completed turned out to be unusable.

After thinking this spelled the end of the day, Fred said no way. He was not leaving when we were so close to finishing. Maybe he's just a glutton for punishment. Or was trying to avoid his visiting in-laws. At any rate, when the work was finally done it was pretty much 8:30. Subtracting the half hour for lunch, that was 13 hours of work! Wow.

Fred says pulling the wires should only take 1/2 day though. Not quite clear if that means a normal 7.5 hour day or a true half day (4-5 hours) though. At any rate, he'll be coming out to finish the job and hook up some temporary outlets and lighting for us. Then we'll actually have power (or Lectre) and be able to call for the rough inspection. Woot!

Tuesday, July 18, 2006

A skeleton in the attic

Gramma's ghost has given way to a skeleton, as sidewalls, knee walls, and ceilings emerge upstairs.
I think this is one of my favorite parts of the whole construction process. For the first time, you start to see how the plans and designs you drew up (years ago) physically take shape. No more 1/4" = 1 foot scale; this is the real thing. Three dimensions, baby!

And it allows you to come up with other ideas. Such as pocket doors to allow more space (and light) into what will be a somewhat narrow laundry room. Or laying out and framing openings for future built-ins, such as two dresser drawers in what will be the master bedroom.

Many of the interior walls are being constructed by our contractor, but Kenny and Brian came up to lose weight during Chicago's massive heat wave last weekend by working in our attic with Jay. Actually, Brian raised the ceiling framing in the master bedroom, and Kenny helped construct the knee walls and insulate the under-eave areas.

Getting the materials upstairs proved to be fun as Mark briefly stopped by at the perfect time to help Ken and Brian toss boards up through the window. This assembly line was so much easier than carrying things through the kitchen and up the stairs. Wish Mark had thought of this sooner! ;-)

Anyway, thanks to Brian and Kenny's help, we got through the long weekend, and we are nearly complete with the framing for upstairs. We're planning on having the electrician come next weekend, and it all needs to be in place by then.

Friday, June 16, 2006

The price for level floors

Well, our crew is halfway done with our floors upstairs. Some of the problem areas (such as above the living room) are already framed with the new LVL joists, and there is some temporary plywood sitting on top of them. Without the floor even being finished, there is already a noticeable difference in our floors. You can actually walk across the "room" without feeling like you're walking in a bowl like it used to feel!

Quite refreshing, to be honest. Especially since this is where our bedroom will be. The key to this whole system was lifting the existing floor from below into a quasi-level state with some house jacks.


The old floor was so far out of whack that we lifted approximately 2 inches at the center of the celing beneath! The new joists are sistered to these old joists, and span the whole length of the room, so they will effectively be holding up the original joists when we release the jacks.

All this, and only 2 small crack in the ceiling's plaster. Other rooms in the house, however, were not as fortunate. A small hole has developed in our first floor bedroom from a dropped (tool? foot? lumber?). Other cracks or smaller holes are evident throughout the other rooms on our first floor. The biggest thing may be the lighting fixtures in our DR and Kit, which dropped down while Jen was making lunch the other day! Thankfully the ceiling fan was OFF, otherwise she may have been beheaded!

Our home is sadly an official hard-hat area now. :(

Thursday, June 15, 2006

Who says you need a roof?

Well, they've done it. They cut open our attic roof to make way for the dormer, and it was truly a marvel to see how much a 20-foot skylight changes things. I don't know if I can fully describe in words, so I'll just post some pix (click images for larger view):

It started innocently enough by cutting the angled part of the attic roof.


Then it proceeded to a 20-foot long hole! They had to erect a temporary wall to hold up the opposite side of the roof.


Cross section of the area behind the chimney (looking East):


... And the other side of the chimney, which we discovered is in desperate need of repair. Jen is a fan of all the light upstairs, as long as it doesn't rain.


When the workers left for the day, our attic became a tinted shade of blue as they tarped off the hole. Looking up at the soothing blues almost make us forget we live amidst chaos. Almost.

Tuesday, May 02, 2006

Starting off on the wrong (left) foot

While awaiting estimates from contractors to frame our dormer, we've begun to take advantage of the still-cool weather to work with the unpleasant work of demolition. Actually, this was planned for a couple of weeks, but we first had to relocate many of the things being stored in our attic. I forgot how much stuff we had up there, so we didn't really get started until this past weekend.

Where would we be without Scott and Julie? They came over Saturday afternoon to lend a hand... and ended up contributing a foot! A foot, you say? Yes indeed, a foot. And a leg too!

Let me explain. Shortly after their arrival, Jen and Julie went to pick up some supplies, while Scott and I removed the carpeting stored up there. After about 5 minutes, we were almost done with this task. On the final trip, we walked across the floor, and suddenly I heard a bursting crash behind me. When I turned around, Scott was about 36 inches shorter, as his left foot had found one of the spaces without any subflooring, and gone straight through our dining room ceiling!

Fortunately the poor guy managed to come up unscathed, which is no small feat. Also fortunate was that this did not happen 10 minutes earlier, when Julie was sitting in the dining room closely under the soon-to-be extra skylight.

We actually covered the whole with an extra piece of drywall and cleaned up before they returned from the store. I know, i know. I should have taken a photo earlier. Oh well - maybe we can recreate it.

Honestly, I figured that sooner or later, someone (most likely me) was going to poke a hole in the ceiling since we have to redo the entire floor up there, so it's probably a good thing we popped the cherry and got it out of the way. Poor Scott felt pretty badly about the whole thing though.

I think he worked extra hard once we got past the unintended demolition and started working on parts of the second floor we actually planned to demo. :)

We managed to get a fair amount accomplished once we covered the floor upstairs :) What will be the master bedroom is completely gutted to the point we need it, except for the floors. Julie even ripped into the wall with a sawzall to make room for some built-in storage! So by the end of the day, we not only increased the ventilation between the first and second floors, but also got some things done!

Monday, April 10, 2006

A Fairy Tale State of Mind ...

Friday is our big meeting with the EV over the upstairs redo. You know, sometimes I forget that the second floor is even there; we've spent so little time up there doing much besides ripping walls down that it's hard to imagine a time will come when most of our evenings is spent ten feet above the ground. I was trying my best to visualize this today, squeezing my eyes shut and imagining the fabulous built-ins that hold sweaters and socks and shoes in the tranquil and non-cluttered master bedroom, the incredible bathroom that will provide hours of zen-esque relaxation in that bubbling 6-foot bathtub, the east-facing bright and airy guestroom that will flood with sweet pale morning sunlight to arouse our overnight visitors from a very restful slumber .... then I opened my eyes and the fairy tale fizzled like a balloon popped with a tack.

Really, it's not that bad. Well, not once I get it out. Ha. I'm finally beginning to see the structure in my head for the kitchen, it only took four months for me to be able to visualize it all, so I'm doing better.

Wednesday, February 08, 2006

What the heck happened to HumphreyHouse?!?

Dear constant reader. We're sorry to leave you craving for updates as to the inner workings of Humphrey House. I think we're still hungover (exhaustion. not just drinking!) from the holidays. It seems more like Hibernating House lately as the few activities we've done have been efforts to prevent heat from escaping and cold from entering. It's amazing how much heat you can keep in by placing a tarp over a stairwell!

Speaking of stairs, we need to start thinking up them. While our original plan was to take the renovation one level at a time, bottom up, we've reconsidered. After seeing everthing involved throughout the basement construction, it would be a shame to finish off our kitchen, and then risk ruining it when taking things in and out for the second floor dormer addition and related work.

So, its back to the drawing board, or drafting table as the case may be. Jay has dusted off the original drawing prints that Vivian began, and has started modifying them. Key among the changes is the removal of 9" from the planned dormer, in order to require with zoning setback requirements. We lose some bathroom space width-wise, but we "might as well" (3 very dangerous words) extend the length from our original planned 12' to 18' total, allowing room for a walk-in closet off the master bedroom.

Erasers fly as Jay space plans, considers plumbing runs, and of course ensures the structure is supported. At least we have some better guidelines after going through the first round of building permits last year. Oh, and how cool is this? Minneapolis kindly showed us what is need to issue a permit for a shed dormer. They have tons of these recommendations! We can only hope OP has the same requirements.

Thursday, June 30, 2005

Getting By With A Little Help From Our Friends

Sometimes Jay and I just sit and marvel at the willingness of our friends to help us on Humphrey House. It's really amazing. You know you have the best friends and family you could ever want when everyone is ready to pitch in like this. I'm more than a little moved by their generosity and goodwill, if you can tell.

Either that, or everybody just wants that trip to Jamaica REAL BAD. :) Seriously, tho, this weekend we had just an amazing WEEKEND WARRIOR TEAM.

Jason's maternal grandpa, "Grandpa Duck," is a tough old guy who runs a handyman business in the city. He came out to assist in some serious window construction, and will be guiding us (who am I kidding, he'll be building it) in the reconstruction of a new stairwell. Grampa Duck rules, and guess what kids, he does one helluva mean "Donald Duck."

Props to Marsha for making the five hour train ride (10 roundtrip) from Carbondale to refinish our front door (among other things). She's my soulsisterfriend from WAY back - the person I've known longest in my life! - and a bit of a slavedriver to boot. It was 97 degrees in the shade, and this girl was outside, in full sun, with JEANS ON, slathering stripper on our new front door (which we discovered had been painted tan, yellow, burnt orange and fugly babyshit yellow before you got down to the beautiful oak [?] beneath) for over FOUR HOURS. Actually, I lost count after that. But it looks AMAZING.

Scott continued working on his "dirtiest guy in da house" reputation by removing the remaining plaster and lathe walls around the staircase, thereby making it the most dangerous space in the house! Scott was, as usual, covered head to toe in black soot. I think I'll start calling Scott "Burt" ... I think that was Ms. Poppin's boyfriend's name in "Mary Poppins." You know, the chimney sweep? :)

It's a long fall from the 2nd floor to the basement ... it's so creepy now walking upstairs and seeing the floor of the basement with every step you take. I think we're making a ban on treks upstairs till further notice. At least until we get that waiver Julie was talking about....

My brother Matt & his fiance Erika also came up and joined in the fun this past weekend. Matt worked on installing the windows, while Erika (a self-proclaimed victim of "project add (attention deficit disorder)" took on a few jobs in the course of the day: stripping with Marsha (woo-howdy!), then stripping the table with me, then peeling off the hideous great-great-grandma-died-in-her-sleep-in-this-bedroom-20-years-ago-and-we've-never-touched-the-room-since blue wallpaper in the bedroom/family room area.


All in all, an incredibly productive weekend. THANKS TO YOU ALL - we'd still be running in circles in a panic in the basement without your help.

SEE THE PHOTOS FROM THE WEEKEND HERE!

Tuesday, March 01, 2005

Take 2: Demolition Derby - 2nd Floor

Scary walls awaited our prybars
After clearing away basement lath and plaster for 4 hours (covering only 150 sq. ft!), Jay emerged from our dusty dungeon to discover what Jen and Ken had done upstairs. Assessing the state of the walls in the de-panelled future bedroom, I got a very creepy feeling. Underneath was a greenish fern/floral print on the ceiling and some kind of wavy yellow-brown organic pattern on the walls. It looked like a nightmare. Frankie later remarked that it looked like someone was trapped or held captive in the room. Remember that movie, People Under the Stairs? Yeah... Not at all encouraging. It begged to be destroyed.

So, late on Sunday night, we did just that. After removing the hideous drywall, we discovered yet another layer... old (and in nice condition) wood wainscotting installed horizontally [View Image]. Maybe this was part of the original attic? If not, someone really liked dark wood. While we won't be keeping this in our future bedroom, perhaps we can salvage it and install in the basement at somepoint (3, 4, 5 years from now...)

Is it live? we'll have to seeA few other interesting discoveries were made up here too. Such as a concealed electrical junction that was probably a light fixture at one time, leaving an eyeball-shaped design. We haven't gotten the circuit tester out to test this yet (project for a rainy day), but tracing the path of these wires will be interesting. We also discovered the remnants of an old closet in this room.

After two long days of work though, our mission was accomplished: We had completely filled a 10 cubic yard dumpster. Extra thanks to our Demo Team helpers, Ken and Frankie! Obviously, since it took 2 weeks to put these posts up, we took some much deserved rest. :)