Wednesday, June 16, 2010

Managing our Rainwater

For those that recall, our home has a number of rain barrels around it. Well, the ones we installed last year were great - until we had a massive intense rain event on our small urban lot. There were a series of issues that combined to cause some water to enter our basement:

  • Lots of rain - a few inches in a half hour
  • Lots of water hitting two rain barrels
  • Rain barrel overflow hose way too small to accommodate flow
  • Barrels located near our exterior basement stairs
  • Neighbor's downspouts also directed towards this area
  • Concrete step that was disintegrated, allowing water to head downhill
  • Floor drain full of leaves and debris, preventing drainage
    = Water coming in the house under basement exterior door!
Tearing apart the concrete last year helped address a number of issues such as grading and building a new concrete step. I also took advantage of this opportunity to reconfigure how our rain barrels worked. The neighbor has since directed her downspouts to keep water on her lawn, but in the meantime I came up with four solutions specifically to handle downpours:
  1. Gutter diverter
  2. Rain barrel interconnection
  3. Underground discharge
  4. Wider overflow hose
1. Gutter Diverter. I ended up purchasing one of the diverters shown at right. The great feature here is a manual lever that can send water either to the rain barrels, or to the downspout. This will allow us to divert water from entering the rain barrels when they're already full. It also is an easy way to winterize the rain barrels. My only change is instead of the final "turn-out" shown in the photo, I used a fold-up ramp that takes water to the rain barrels.

2. Rain barrel interconnection. Every set of directions I've ever seen for connecting rain barrels seems to say they should be interconnected at the top overflow hose. After our basement flooded, I thought about this and it makes no sense. If you connect two or more barrels at the bottom, they will fill up at equal rates rather than having one fill up completely and hoping the overflow works faster than any new rainwater coming in. Here's a photo showing the diversion system, as well as the two barrels (on either side of our side gate) connected in tandem. The connection hose is hidden from view behind them.


3. Underground discharge. I know I'm a nerd when I think this was a fun way to spend some time. When excavating for our bluestone pavers last year, I had the foresight to take advantage of the opportunity to dig a bit deeper, and create an overflow area for storm water that would carry it away from our our home's foundation wall. I purchased a 10' section of 4" PVC, added an elbow and a cleanout with a cap on one end (which can be capped in winter), and a Tee with access port on the other end.

After this, I connected 10 feet of drain tile (perforated tube) wrapped in landscape fabric to prevent silt infiltration, and ran it out where the old concrete sidewalk had been. All told, this runs about 25 feet away from the foundation wall.

Honestly I recognize this is excessive to accommodate overflow and way more than what most people need. Don't be scared into thinking you have to do this if you want rain barrels. We did this more because we had the opportunity. That said, you do need to have some kind of plan to take the overflow from the barrels. I highly recommend the following video showing more traditional rain barrel overflow.

4. Wider overflow hose. This particular downspout handles exactly one-half of the roof area of our home, over 1,000 square feet of surface area. In a 1" rainfall, that means we're getting 620 gallons of water! Because of the large roof area, our (2) 65-gallon rain barrels fill up after roughly 1/4 of an inch of rainfall. In heavier rains, the small garden hose overflow can not handle the volume of water coming down the downspout.

The solution? Drill a new hole and install a 1.5-inch wide sump-pump hose. If its' good enough for leaky basements, its good enough for several gallons of rain per minute. Sump-pump hoses are sold in 20' lengths. I tried searching for something shorter but then I realized that I could snake the entire 20 feet all the way through the 4" drain tile system mentioned above. This puts the overflow way out in the yard in case there wasn't enough pitch to carry the water away. For you eagle-eyed home improvement experts, the hose is connected to an old stainless steel drain fitting from one of the sinks we took out of the home.

So, with these four measures, our stormwater management system is much better engineered. As I mentioned earlier, this type of system is overkill for most homeowner's needs. But we had a confluence of events that led to a leaking basement, and we don't want to have that ever again.

The weather the last few weeks in Chicago has put this to the test as it has been raining almost every day. Our barrels are full, and the manual downspout diverter is sending excess water to the storm sewer system. And I can sleep better knowing that any water that splashes past the diverter and makes its way to the rain barrels is overflowing into the backyard, away from the basement.

Monday, June 14, 2010

Building a Planter Box

The last few months have been too busy to blog, but we're going to try and carve out specific times to update the blog to let you know all that's been happening at (mostly outside of) Humphrey House.

We'll start with something actually made before winter: A raised bed planter box in the backyard. Since our porch is a half-story off the ground (about 5'feet) and we have a small yard, we felt like we needed something to help transition the yard to the porch.

I originally had brought home used railroad ties and had planned to use those to construct the raised bed. I figured they'd be nice thick materials and provide plenty of butt space. Plus, they were quite cheap and very thick. Perfect right?

Well, as I was unloading them, I realized a lot of "stuff" was coming off. This stuff is creosote, and is what railroad ties are treated with to resist decay. After reading up and learning creosote is probably carcinogenic to people and contaminates groundwater, I realized I probably don't want to bring that onto our property, much less have people sitting on it. So, I took the railroad ties back to the store and got regular 6x6 treated lumber (ACQ, not CCA).

Anyway, because the timbers are 8 foot lengths, I planned to make a 6' x 2' raised bed, using four courses of timber to give the planter a comfortable sitting height. To start, I dug trenches a couple inches down into the soil for foundation drainage, and filled this pea gravel and sand. This made leveling the raised bed much easier as well, since there originally was a slight slope from the left to the right sides.

I laid the first course using full 8-foot lengths, and then cutting two 1'-6" pieces for the short ends. The next course would be 7' on the long sides, and a full 2 feet on the ends to stagger the joints. However, I soon realized that I was going to need something to keep these all together once they were stacked.

Fortunately I had a few 2'foot lengths of rebar lying around (doesn't everyone?), so I bored 3/4" holes through the corners and "persuaded" the rebar through with the help of my trusty mallet. I did the same for the second course. The third course I only bored halfway through so it was a sort of "cap" that would add support and then the rebar wouldn't be visible.

Because I imagined a 400-pound gorrila coming over and wanted to over-engineer the planter bed, I poured extra sand through a funnel down the boreholes around the rebar so it would extra be solid. I also had some galvanized steel (safe for contact with treated lumber) right-angle ties that I used on the top course to further anchor the front side of the planter to the two sides and the back side, so the entire top course is tied together. And just to be safe, I lined the sides of the bottom two courses with plastic so the AC2 chemicals stay away from the soil we put in there.

All said and done, it came together wonderfully. We now have a nice planter bed next to the porch that will be a perfect spot for herbs, veggies and flowers and an occasional butt when we're enjoying the outdoors. Here's how it looked at completion:

And how it looks now with a garden of herbs and lettuce growing in it:

Wednesday, December 30, 2009

Farewell 2009 and Happy New Year

We setup a small tree this year for the holidays in our family room, and it turned out to be a cheerful addition for the holidays. Those with astute eyes may recognize the "major award" in the box under the tree. :-)



Here's to a wonderful and sustainable New Year in 2010!

Tuesday, December 22, 2009

Thursday, December 10, 2009

Placing Pavers

Well it took a bit of time to install (and even more time to post), but we got our bluestone pavers all in place. It wasn't easy as the shapes were mostly rectilinear, so we had to conjure up some old Tetris skills (see Dad, I told you Nintendo was good for us!). We were able to lay out a design that would blend the large stones with the small, yet have the durability to last.


We started by "cascading" the largest pavers in the high-traffic area of the back yard, near the rear stairs. These large stones are roughly 3 x 4, and quite hefty! But by offsetting each by about 6" or so, the pattern creates an optical curve from the gate towards the back yard.

We then had to reserve some large 2' x 4' stones for the walkway that connects our garage to the patio.

The pavers are not grouted or set in concrete, but instead the joints are filled with sand and stone dust. This permeable paving allows for stormwater to drain through the paved area more naturally, instead of diverting all the water to the edges of the patio. It also will be more tolerant of any movement due to freeze/thaw cycles during winter.

The colors of the bluestone pavers are a muted in these photographs of the completed job area due to the final layer of stone dust. After winter, we'll likely do a light powerwash to remain any residual surface grime. In any case, here is the completed work:




Everything wrapped up pretty nicely, and we even have a pile of remnants we may do something artistic with next year. For the time being though, we had about one nice day that we got to enjoy our patio before the weather started to really cool down. After the winter snows freeze and thaw, hopefully there will be little movement between the pavers.